• nisku-bridge

    Nisku Overpass Bridge Load Evaluation

  • supreme

    Supreme Crane Runway Expansion

  • BLE NSR

    Bridge Load Evaluation

  • ardy-rigging

    Hagwilget Bridge

  • 107.4 Ashcroft. Right side

    CN - Ashcroft

  • CN Trestle

    CN Trestle Bridge

  • Blueberry

    Blueberry Bridge Load Evaluation

  • dscn0771

    Coast Edmonton Bridge Rehabilitation

  • 30 ave

    Edmonton 30 Avenue

City of Wetaskiwin – Roundabout Assessment

 

GeoMetrix was retained by the City of Wetaskiwin to perform an Independent Design Review (IDR) of an existing roundabout foundation including: bollard foundation design, sign foundation design, and the foundation of a future monument. The Roundabout located at 50 Avenue and 47 Street in Wetaskiwin was originally constructed in 2013-2014 as part of a revitalization program. GeoMetrix performed a visual review and confirmed the design codes and applicable standards used for the structural design. The as-built foundation type consists of concrete skin friction piles supporting a concrete grade beam or pile cap which support signs, bollards, or future monument structures. The IDR considered the foundation types chosen, alternative foundation times and relative costs and merits of the selected foundation, and confirmed the structural capacity of the proposed foundations.