• nisku-bridge

    Nisku Overpass Bridge Load Evaluation

  • supreme

    Supreme Crane Runway Expansion

  • BLE NSR

    Bridge Load Evaluation

  • ardy-rigging

    Hagwilget Bridge

  • 107.4 Ashcroft. Right side

    CN - Ashcroft

  • CN Trestle

    CN Trestle Bridge

  • Blueberry

    Blueberry Bridge Load Evaluation

  • dscn0771

    Coast Edmonton Bridge Rehabilitation

  • 30 ave

    Edmonton 30 Avenue

City of St. Albert – Tache Street Airplane Relocation

 

GeoMetrix was appointed by City of St. Albert to undertake the design for a pedestal to mount a R.C.A.F. Lockheed T-333AN Silver Star 3 (T-bird). The design included: concrete mono pile, steel pipe shaft pedestal to support the airplane, concrete anchorage design, and connection design to mount the airplane on top of the pedestal. Various options for the pedestal design were first presented to the Client using SketchUp for 3D visualization and confirmation of clearances in the adjacent parking lot. Detail CAD drawings were developed and presented to support design and assumptions. GeoMetrix also provided services during construction to review and monitor: pile installation, lifting procedures, installation of the aircraft on the new pedestal, and overall site restoration.