During a high flow period a bridge size culvert washed out (BF 75043) near Debolt. GeoMetrix was retained by Alberta Transportation to assess the condition, evaluate the hydraulics of the flow, and propose culvert replacement options. The selected alternative was a new 2.4 m diameter x 28 m long CSP culvert. This project was an emergency repair that fell under a BMA (Bridge maintenance agreement) and the highway maintenance contractor was responsible for construction. GeoMetrix provided the new culvert design, guardrail design, construction inspection, field verified quantities and contract administration services during construction.