Anthony Henday Deicing Pumphouse

 

The project involved the installation of a FAAST de-icing system on the southbound lanes of Anthony Henday Drive over the North Saskatchewan River in the City of Edmonton. GeoMetrix was retained by the successful contractor to provide structural design including construction drawings of the pumphouse. The building was designed to accommodate the mechanical installations (pumps, tanks, monitoring, instrumentation, etc.) required for the FAAST system. Services also include foundation design for a tower holding instrumentation related to the deployment of the FAAST system