• nisku-bridge

    Nisku Overpass Bridge Load Evaluation

  • supreme

    Supreme Crane Runway Expansion

  • BLE NSR

    Bridge Load Evaluation

  • ardy-rigging

    Hagwilget Bridge

  • 107.4 Ashcroft. Right side

    CN - Ashcroft

  • CN Trestle

    CN Trestle Bridge

  • Blueberry

    Blueberry Bridge Load Evaluation

  • dscn0771

    Coast Edmonton Bridge Rehabilitation

  • 30 ave

    Edmonton 30 Avenue

30 Ave Bridge Replacement

 

GeoMetrix was retained by the prime consultant as the bridge sub-consultant on this bridge replacement project for the City of Edmonton. A new 42m clear span integral abutment bridge utilizing steel plate girders was designed to cross Blackmud Creek in south Edmonton. The bridge replaced a 50 year old timber trestle bridge that was at the end of its lifespan. Utilizing a clear span bridge over the creek was chosen to minimize the environmental impacts of the creek crossing. GeoMetrix provided preliminary engineering, detailed design, tender package preparation, and construction administration for the project.