GeoMetrix was retained by Tetra Tech to provide construction inspection and administration services for the construction of the 212 Ave over Deerfoot Trail overpass (BF82500). The new two span bridge, 45.0m – 48.0m, consists of nine (9) lines of 2.4 m deep post-tensioned concrete NU girders.  Engineering services provided included 1) shop drawing submission review for structural components, 2) precast NU girder fabrication inspection, and 3) full time bridge construction inspection and reporting.