• nisku-bridge

    Nisku Overpass Bridge Load Evaluation

  • supreme

    Supreme Crane Runway Expansion

  • BLE NSR

    Bridge Load Evaluation

  • ardy-rigging

    Hagwilget Bridge

  • 107.4 Ashcroft. Right side

    CN - Ashcroft

  • CN Trestle

    CN Trestle Bridge

  • Blueberry

    Blueberry Bridge Load Evaluation

  • dscn0771

    Coast Edmonton Bridge Rehabilitation

  • 30 ave

    Edmonton 30 Avenue

Horsehills Creek Bridge Replacement

 

GeoMetrix was retained by City of Edmonton (CoE) as the prime consultant on this bridge replacement project. The existing bridge is a single span (8.5m) VS girder superstructure supported on timber substructure. It is located within the sensitive North Saskatchewan River Valley. The stringent environmental regulations placed a big challenge to the design team. To replace the bridge GeoMetrix proposed AT standard 10m SLW girder superstructure with cast-in-place integral abutments. The site is highly corrosive. The piles are designed to include sacrificial loss of the pile section. GeoMetrix provided services during tender and construction including contract administration and field inspection. The project was complete in 2017.