• nisku-bridge

    Nisku Overpass Bridge Load Evaluation

  • supreme

    Supreme Crane Runway Expansion

  • BLE NSR

    Bridge Load Evaluation

  • ardy-rigging

    Hagwilget Bridge

  • 107.4 Ashcroft. Right side

    CN - Ashcroft

  • CN Trestle

    CN Trestle Bridge

  • Blueberry

    Blueberry Bridge Load Evaluation

  • dscn0771

    Coast Edmonton Bridge Rehabilitation

  • 30 ave

    Edmonton 30 Avenue

Project Type: Infrastructure Facilities

City of Wetaskiwin – Roundabout Assessment

  GeoMetrix was retained by the City of Wetaskiwin to perform an Independent Design Review (IDR) of an existing roundabout foundation including: bollard foundation design, sign foundation design, and the foundation of a future monument. The Roundabout located at 50 Avenue and 47 Street in Wetaskiwin was originally constructed in 2013-2014 as part of aContinue Reading

City of Wetaskiwin – Reservoir Shoring

  GeoMetrix provided structural engineering and drafting services for a temporary shoring design to support the concrete roof slab of the Garden Meadows Water Reservoir during beam and slab repairs. The Reservoir is constructed of a concrete roof slab with drop panels spanning between concrete columns. Corbel roof beams are provided at edges if theContinue Reading

Anthony Henday Deicing Pumphouse

  The project involved the installation of a FAAST de-icing system on the southbound lanes of Anthony Henday Drive over the North Saskatchewan River in the City of Edmonton. GeoMetrix was retained by the successful contractor to provide structural design including construction drawings of the pumphouse. The building was designed to accommodate the mechanical installationsContinue Reading

Highway 63 Deicing Pumphouse

The project involved the installation of a FAAST de-icing system on Highway 63 over the Athabasca River in Northern Alberta. GeoMetrix was retained by the successful contractor to provide structural design including construction drawings of the pumphouse. The building was designed to accommodate the mechanical installations (pumps, tanks, monitoring, instrumentation, etc.) required for the FAASTContinue Reading

Highway 770 Slab Crossing

GeoMetrix was retained to provide structural design of an intersection treatment crossing slab on Highway 770. The slab needed to accommodate a large mining shovel without damage to the intersection. GeoMetrix provided structural design including construction drawings for the project.Continue Reading

Buckingham Pipeline Crossing

GeoMetrix was retained by the developer of a new commercial development in Sherwood Park. The internal road network needed to cross a 24” diameter crude oil pipeline that needed to be protected to ensure there was no damage due to traffic loads. A precast concrete crossing slab system as designed and detailed by GeoMetrix forContinue Reading

Village of Myrnam Reservoir Assessment

The project involved the detailed inspection of an existing water reservoir to determine the condition of the concrete structure. GeoMetrix conducted a detailed inspection of the exterior and interior of the reservoir utilizing divers and a remote operated vehicle to determine the existing condition of the reservoir.Continue Reading