• nisku-bridge

    Nisku Overpass Bridge Load Evaluation

  • supreme

    Supreme Crane Runway Expansion

  • BLE NSR

    Bridge Load Evaluation

  • ardy-rigging

    Hagwilget Bridge

  • 107.4 Ashcroft. Right side

    CN - Ashcroft

  • CN Trestle

    CN Trestle Bridge

  • Blueberry

    Blueberry Bridge Load Evaluation

  • dscn0771

    Coast Edmonton Bridge Rehabilitation

  • 30 ave

    Edmonton 30 Avenue

Project Type: Bridges

Connors Road Pedestrian Bridge – Crane Mats

  As part of the City of Edmonton’s Valley Line Southeast expansion project, an existing through truss bridge carrying pedestrian traffic over Connors Road in Edmonton was due for replacement. The new Kâhasinîskâk bridge, a sinusoidal shaped through steel plate box girder bridge, was designed by the TransEd LRT Group to replace it. Supreme SteelContinue Reading

Precast NU Girder Inspection for West Calgary Ring Road

    EllisDon retained GeoMetrix for precast plant inspection during fabrication of the NU girders for the West Calgary Ring Road expansion. GeoMetrix performed daily inspections and documented the NU Girder fabrication in accordance with Alberta Transportation requirements. The inspections include the following process: 1) Form geometry, 2) Inserts, reinforcement, WWM, prestressing and post tensionContinue Reading

West Calgary Ring Road IDR

  AECOM retained GeoMetrix for Independent Design Review (IDR) on a total of twenty bridge structures that comprise the West Calgary Ring Road (WCRR) expansion. An independent design review was required by Alberta Transportation for these new bridge structures. The bridge structures consisted of single span skewed steel plate girder bridges, prestressed NU girder bridges,Continue Reading

Aspen Trail Pedestrian Bridge

  GeoMetrix was retained by Select Engineering to coordinate the design of this bowstring pedestrian bridge for the Aspen Trail Community in Sherwood Park, Alberta. This 15 m long bridge connects the shared use path over a drainage channel which is connected to a nearby storm water pond. The design of substructure was composed ofContinue Reading

212 Ave over Deer Foot Trail

    GeoMetrix was retained by Tetra Tech to provide construction inspection and administration services for the construction of the 212 Ave over Deerfoot Trail overpass (BF82500). The new two span bridge, 45.0m – 48.0m, consists of nine (9) lines of 2.4 m deep post-tensioned concrete NU girders.  Engineering services provided included 1) shop drawingContinue Reading

Entrance Bridge Design Check (BF70580)

  GeoMetrix was retained by the prime consultant for this major bridge rehabilitation over the Athabasca River. The existing bridge is a railway truss originally constructed in 1913 that was converted into a highway bridge in 1963 with the addition of precast concrete stringers. Due to deterioration the exterior stringers and barriers are being removedContinue Reading