An additional lane was proposed for the Wedgewood Creek Bridge(s) on Anthony Henday Drive as part of the overall south leg widening. To widen the 41.5 – 52.0 – 41.5 m continuous span bridge(s) over Wedgewood Creek an additional line of precast NU girders were required on each bridge. The erection scheme included a… Continue Reading
GeoMetrix was retained by Mammoet Canada to perform a Bridge Load Feasibility Study for a Splitter Permit Load Transported on Bunked 4- File 26 Line Conventional Scheuerle Configuration Crossing Nine Bridges on the Transport Route between Edmonton, AB and Redwater, AB. From this load evaluation it was found that the Namepi Creek Bridge on Highway… Continue Reading
GeoMetrix was retained by Mammoet Canada to perform a Bridge Load Feasibility Study for a Splitter Permit Load Transported on Bunked 4- File 26 Line Conventional Scheuerle Configuration Crossing Nine Bridges on the Transport Route between Edmonton, AB and Redwater, AB. From this load evaluation it was found that the North Saskatchewan River Bridge… Continue Reading
GeoMetrix was retained by Mammoet Canada Western (Mammoet) to perform a bridge load evaluation for 18 bridges on the route from Coutts, AB to the Northwest Redwater Upgrader Site near Redwater, AB for transporting a CO2 Absorber permit vessel in January 2016. The CO2 Absorber had a GVW of 903 tonnes, which included a… Continue Reading
GeoMetrix was retained by Bidell Gas Compression (Bidell) to perform a bridge load evaluation for the Blueberry River Bridge (B01443) in order to transport a 250 tonne (GVW) compressor permit load on an 84 wheel trailer configuration. The existing bridge on Beatton River Road is a single lane, seven span bridge, with nine lines… Continue Reading
GeoMetrix was retained by the prime contractor undertaking the rehabilitation (painting, strengthening, corrosion attention, etc) of this major bridge over the Little Smoky River on Highway 49 (BF74440) to complete a load capacity evaluated of the structure as well as any required strengthening to allow the bridge to meet rehabilitation loading demands. The existing… Continue Reading
GeoMetrix was retained by Ardy Rigging on this large Constraint Induced Fracture (CIF) project to undertake a bridge load evaluation to accommodate the contractors temporary works as well as existing traffic on the bridge simultaneously. The existing structure on Highway 831 is a two girder bridge over the North Saskatchewan River and is therefore considered fracture… Continue Reading